Electrical tender estimating

Get to the electrical scope faster.

TenderAI helps electrical estimators review large tender packs without turning the output into another specification. It focuses the Step 1 briefing on what needs doing, where the work is, existing conditions, the proposed installation, specified materials and the commercial risks that matter to the price.

Lighting, power, distribution, containment and specialist-system scope
Specified cable, accessory and containment requirements surfaced for review
Existing-versus-proposed installation context by area where available
Drawing take-off and Excel BOQ stage kept separate from the scope briefing

Built around how electrical tenders are priced

Electrical tender packs often spread important information across specifications, schedules, preliminaries, F10/CDM information and drawings. TenderAI brings the pricing-relevant points together into one estimator briefing.

Find scope gaps before they become variations

Surface responsibilities, interfaces, exclusions, testing, commissioning, certification, temporary supplies, phasing, access and other requirements that can materially affect the tender price.

Use the drawings for quantities

After reviewing scope, move to the drawing BOQ stage for structured take-off data by drawing reference. This keeps narrative scope and measured quantities clear.

Works beyond electrical

If a project includes mechanical, plumbing, fire, data, civils or other packages, the same tender can be organised across multiple trades for a main-contractor workflow.

Frequently asked questions

Can TenderAI analyse electrical tender documents?

Yes. TenderAI can focus the review on the electrical package, including scope, lighting, small power, distribution, containment, data, fire and security interfaces, testing and certification requirements where stated in the tender.

Can it identify cable and containment requirements?

Yes. The Step 1 estimator briefing is designed to surface specified cable types, containment systems, accessories and other material requirements where they are stated in the documents.

Can it read electrical drawings for quantities?

TenderAI has a separate drawing BOQ stage that creates structured quantity lines for estimator review rather than mixing drawing counts into the scope summary.

Is it only for electrical contractors?

No. Electrical is one supported work package. TenderAI is designed for single-trade subcontractors and multi-trade main contractors.

Spend less time reading tender packs. Spend more time pricing.

TenderAI keeps estimator judgement in control while helping organise scope, drawings, risks, RFIs and BOQ-ready data.